Last | Top | Next

Research Contracts
Prof. John R. White

Co-principal Investigator (with Leo Bobek) on Project No. 14-08567, "Design, Construction, and Testing of an Ex-Core Fast Neutron Irradiation Facility for the UMLRR," Intersil Corporation, Mountaintop, PA, April 2000 - August 2002.

Principal Investigator on Project No. 05-08620, "Activation Analysis for the Fermi 1 Reactor," Duke Engineering and Services, Inc., Marlborough, MA, June 2000 - January 2001.

Principal Investigator on Project No. 05-08453, "Benchmarking Activation Analysis Techniques," Duke Engineering and Services, Inc., Marlborough, MA, October 1999 - January 2000.

Research staff directing the "Computational Support for the HEU to LEU Conversion of the UMLRR." This was part of a larger project directed by Leo Bobek (Project No. 14-08239-F) for "The Conversion of the UMass-Lowell Research Reactor from High Enriched Uranium to Low-Enriched Uranium Fuel," Department of Energy, January 1999 - December 1999.

Principal Investigator on Project No. 05-08186, "Phase I Computational Model Development in Support of the HEU to LEU Conversion at the UMass-Lowell Research Reactor," Aspen Systems, Marlborough, MA, October 1998 - December 1998.

Principal Investigator on Project No. 05-07895, "Characterization of the Neutron Spectrum in the UMass-Lowell Research Reactor," Aspen Systems, Marlborough, MA, October 1997 - April 1998.

Principal Investigator on Project No. 05-07819, "Preliminary Characterization of the Neutron Spectrum in the UMass-Lowell Research Reactor," Aspen Systems, Marlborough, MA, July 1997.

Principal Investigator on Project No. 05-07741, "Development of the ACTIV Code," Yankee Atomic Electric Company, Bolton, MA, April 1997 - Sept. 1997.

Principal Investigator on Project No. 05-07140, "Modifications to the FORSS Code," Knolls Atomic Power Laboratory, Schenectady, NY, March 1995 - Sept. 1995.

Co-principal Investigator (with Lee Bettenhausen) on Project No. 14-06968, "Determination of Service Life for Excore Detector Cables in Seabrook Station," North Atlantic Energy Corp, Seabrook, NH, Sept. 1994 - June 1995.

Principal Investigator on Project No. 05-05842, "Physics Analysis of the Modular High Temperature Gas-Cooled Reactor (MHTGR)," Martin Marietta Energy Systems, Inc., Oak Ridge, TN, Feb. 1991 - Dec. 1991.

Principal Investigator on Project No. 05-05169, "Sensitivity and Uncertainty Analysis of the High Converter Reactor (HCR)," Siemens AG, KWU, Federal Republic of Germany, Sept. 1988 - Sept. 1989.

Co-principal Investigator (with Thomas Wallace), "Low Enriched Fuel Conversion for Research Reactors," Department of Energy, Washington D.C., Sept. 1986 - Sept. 1988.

Principal Investigator on Project No. 05-03978, "Demonstration of Generalized Perturbation Methods for LWR Applications," Westinghouse Electric Corporation, Pittsburgh, PA., Jan. 1984 - Jan. 1987.

Principal Investigator on Project No. 05-03841, "Physics Analyses of the High Temperature Gas-Cooled Reactor (HTGR)," Martin Marietta Energy Systems, Inc., Oak Ridge, TN, Oct. 1983 - June 1985.

Principal Investigator on Project No. 05-03606, "Large Core Design Methods and Applications," Union Carbide Corporation, Oak Ridge, TN., Sept. 1982 - March 1984.

Last updated by Prof. John R. White (January 2003)

Last | Top | Next

 
 
Main | Current Activities | Courses | Research | Vitae | Misc. Goodies